Spiral welded, anti-corrosion, plastic-coated and pre-insulated steel pipe — manufactured in one plant, delivered to one specification.
Double-sided submerged arc spiral welded pipe for water, structure and piling.
FBE / 2FBE / 3PE / TPEP systems for buried gas, water and sewage lines.
Direct-buried polyurethane pre-insulated pipe for district heating networks.
Steel-jacket steam insulation for high-temperature steam transmission.
Plastic-coated pipes for water supply, fire fighting, mining and cable protection.
Elbows, tees, reducers, flanges and valves matched to the main line — one order, one shipment.
Send us the medium, design pressure and diameter — we will confirm the wall thickness and coating, and quote within 24 hours.