Water transmission pipe for a plant extension, raising county-town supply capacity.
The Jiuligang plant extension required the transmission main to be laid and tied in without stopping plant output.
Anti-corrosion SSAW pipe for potable water was supplied, bore treated to drinking-water requirements, delivered in batches to match the on-site tie-in schedule.
Tell us the medium and diameter — we reply with a proposal within one working day.