2022 · Belt and Road / China-Pakistan Economic Corridor water line for the Saindak copper-gold mine. DN600 national-standard spiral pipe, 9 m fixed length, coal-tar epoxy outside and cement-mortar lining inside; over 38,000 m of line, manufacturing supervised throughout, 325 truckloads shipped from Tianjin Port, and a company vice-president stationed on site in Pakistan for 40 days of after-sales support.
The project is the water transmission line for the Saindak copper-gold mine on the Belt and Road / China-Pakistan Economic Corridor: over 38,000 m of DN600 national-standard spiral pipe at 9 m fixed length.
Protection is coal-tar epoxy outside and cement-mortar lining inside, covering both soil-side corrosion and water-side hygiene. Manufacturing was supervised throughout, with hydrostatic testing and coating inspection by batch.
Logistics ran to 325 truckloads consolidated at Tianjin Port for shipment. A company vice-president was stationed in Pakistan for 40 days for handover and after-sales support, staying on until the line was closed.
Tell us the medium and diameter — we reply with a proposal within one working day.